Starr Creek Special Road District is inviting you to a scheduled Zoom meeting.
Topic: Starr Creek Special Road District’s Personal Meeting Room
Join Zoom Meeting
https://us06web.zoom.us/j/2343795808?pwd=Z3I2NWJWZGVMK0h1QWovUWJ0M0ZYUT09
Meeting ID: 234 379 5808
Passcode: 9bHviL
One tap mobile
+16699006833,,2343795808#,,,,741163# US (San Jose) +12532158782,,2343795808#,,,,741163# US (Tacoma)
Dial by your location
+1 669 900 6833 US (San Jose)
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
+1 929 205 6099 US (New York)
+1 301 715 8592 US (Washington DC)
+1 312 626 6799 US (Chicago)
Meeting ID: 234 379 5808
Passcode: 741163
Find your local number: https://us06web.zoom.us/u/kwCpkIN4S
Starr Creek Special Road District
October 4, 2021, 7 PM via Zoom
The meeting of the District Commissioners is to conduct the business of the district. A public audience is welcomed. Public discussion on agenda topics will begin after initial discussion by the commissioners. Discussion will be limited to civil discourse as observed by the commission.
Meeting Agenda
Welcome: Meeting called to Order
Commissioner introduction and attendance
Approval of Meeting Minutes:
September 1, 2021 regular meeting (see attached)
Financial Report: September transactions and balance
– Old Business:
- Monthly road maintenance report; signe installation, limb trimming and ditches.
– New Business
Set time and date for next meeting:
November 1, 2021, 7PM for Zoom meeting.
______________________________________________
Published by starrcomm
Years ago, actings an assistant to a USFS engineer, I took part in the monitoring of all dirt roads within the district, and during those years, I traveled thousands of miles on every kind of dirt road you can imagine. checking for erosion, blocked ditches, culverts, creeks, berms, the impact of travel, slopes, and runoff. Up to the snow-line and back. Along roads that followed rivers dotted with giant tailing piles and deserted dredges leftover from mining along with the miles and miles of ditches used to move water to feed the giant cannons used in hydraulic mining. Into and out of wilderness areas, we followed one-track’s that led to established hunting camps and roads that were built for patented mining claims without the availability of a blade to cut the grade in the mountain. Access roads for tracts of timber going up for bid and the temporary roads inside a logging show. Skid roads to landings, to haul roads to get the logs back to the access road. Dust abatement, water, oil, and plant-based had to be considered. Haul roads often down-sloped and dicey, enough to make an experienced city driver get out of the truck and walk off the job. I’ve been down roads that looked more like a goat track, high above the creek bed, with the distance between the outside tire and air measured in inches. Enough to have me scribbling my last wishes on my lunch bag while keeping an eye on the upper bank for something to grab onto if the truck went over the edge. For those years, we covered every road within an area probably the size of Lincoln county. In my off time, I sometimes played at mining gold, In smaller waterways, using shooter damns, and dredging in the larger creeks. You could say that I have more than a passing acquaintance with dirt and water. I guess you could say it was my love of dirt and water, ad the challenges they present, that drew me to this position. I look forward to getting things done.
View more posts